Underpinning is carried out in accordance with the building’s structural requirements and the engineering design. The sequence depends on the footing type, site access and selected repair method.
1. Inspection and structural planning
The affected foundations are assessed, and any required engineering design and supporting documentation are established before structural work begins.
2. Permits and preparation
Building permits and required inspections are arranged in accordance with the project responsibilities. The work area is prepared, including access and any temporary supports or protection specified for the job.
3. Strengthening the existing footing
Where a traditional concrete underpinning design is suitable, sections beneath an existing footing may be excavated and additional concrete support constructed in a controlled sequence. Other designs may be specified where ground conditions or structural needs require a different approach.
4. Inspections and completion
Required inspections take place at the relevant stages. Once the structural work is complete, affected areas are made good to the extent included in the agreed scope and the required completion documentation is addressed.
Underpinning does not automatically return every wall or floor to its original position. The scope and achievable outcome depend on the building’s condition and design. Existing plaster or brickwork repairs may still be required after the structural work.